All activities in all zones shall have the status identified in Table 10A.1: Activity Status for Network Utilities. Symbols used in Table 10A.1: Activity Status for Network Utilities have the meaning described in Table 1A.2: Activity Status.
Note: While only transmission and key electric lines are identified on the Planning Maps, works in close proximity to all electric lines can be dangerous. Compliance with the New Zealand Electrical Code of Practice 34:2001 is mandatory for buildings, earthworks and mobile plants within close proximity to all electric lines. Compliance with the Electricity (Hazards from Trees) Regulations 2003 is also mandatory for tree trimming and planting. To discuss works, including tree planting, near electrical lines especially within 20m of those lines, contact the line operator.
Table 10A.1: Activity Status for Network Utilities
Definitions in this section
activity/activities
aerial
antenna
building
cabinet
council
electric line
gross floor area (gfa)
height
infrastructure
mast
minor upgrading (in relation to electric lines)
network utility
the plan
renewable energy generation
road zone
rural zones
sign
site
small and community-scale distributed renewable energy generation
stormwater overland flowpath
stormwater reserve
structure
substation
telecommunication line
transmission electric line
wastewater
water supply resevoir
wind energy facility